BMS has successfully completed a complex task involving the lifting and transportation of two transformers, each weighing 146.3 tons. The project was carried out for Aalborg Forsyning A/S and utilized some of our most powerful mobile cranes:
- 450-ton mobile crane: LTM 1450-8.1
- 750-ton mobile crane: LTM 1750-9.1
Efficient tandem lift from ship to quay
The project required precision work, where the transformers were lifted from a ship to the quay in a perfectly coordinated tandem lift. Our team delivered an efficient and safe solution, showcasing BMS’s expertise in heavy lifting.
Benefits of our approach:
- Simple and time-optimized rigging: The cranes were rigged with the main boom and ballast only, reducing complexity and saving valuable time.
- Reduced load on quay and environment: The larger spread of the crane support pressures minimized stress on infrastructure and protected the local environment.
- 100% control over the lift: By using two cranes, the risk of unwanted oscillations was eliminated, ensuring maximum precision and stability.
Focus on safety and sustainability
At BMS, we always strive to deliver solutions that combine safety and sustainability. This project demonstrated our ability to minimize environmental impact while ensuring an efficient and safe operation.
Aalborg Forsyning A/S, as the client, required a reliable partner for this task, and we are proud to have delivered a successful solution.