New stadium in Aarhus

The construction of the new stadium in Aarhus is a project at the heavy end. Not only in kilos and tons, but in coordination, sequences and cooperation. Here, several cranes have worked simultaneously in a construction process where timing and planning have been crucial.
Case

Roofboxes for New OUH

On the construction of Nyt OUH in Odense, installing large roofboxes above the elevator shafts has been a special task for almost a year and a half.
Case

The coal bridge in Aarhus

A 57-ton bridge section had to be transported through the city and lifted into place between the buildings in the Spain area of Aarhus. The task required precise planning, close collaboration and the right equipment.
Case

Installation through the facade

Installation of specially designed steel stairs in office buildings with limited access and assembly on multiple levels.
Case

Driving plates for T-Hansen fireworks stands

BMS has handled both road plates and containers for several years in connection with the fireworks season at T-Hansen. The video shows our driver Søren laying out road plates so that the stalls can be set up safely and efficiently and there are good access routes. The task requires both logistics and speed, and solutions that work in practice.
Case

When heavy lifting starts on the drawing board

Skybridges at Nyt OUH in Odense weigh up to 158 tons and therefore the lift starts long before the crane moves in. Thorough planning, lifting plans, crane selection and engineer-calculated, CE-approved special equipment are essential for a safe lift. The lift was planned by BMS Project & Engineering and carried out in collaboration with BMS Heavy Cranes. A close collaboration that ensures quality and efficiency all the way.
Case

BMS elevates culture at Smukfest

For many years, BMS Aarhus has been providing stages, equipment and cultural experiences at Smukfest, from construction to dismantling and cleanup after the festival.
Case

Bridgelift received the ESTA Award of Excellence 2023

Normally, you rarely notice the work that goes into building a bridge. But when BMS Group lifted a 95-ton steel bridge on Lynetteholm, the task became so complex and unique that it was awarded the ESTA Award of Excellence 2023.
Case

Efficient replacement of a telephone antenna in just five hours

BMS moved and installed a new 5G antenna in just five hours with a 60 m crane. The task was completed even with trees, tennis courts and sloping terrain on site.
Case

Safe lift in the heart of Copenhagen

BMS lifted a 14 m wide and 30 m high banner on the Copenhagen City Hall Tower in the middle of the city. The lift was placed on iron plates to protect the cycle path and ensure stability during the work.
Case

Harbour Crane Renovation at the Port of Aarhus

BMS used three large cranes to lift and reassemble a 460-ton crane after slewing ring replacement in a saltwater-exposed environment.
Case

Transport of 40 XXL monopiles

BMS handled the internal transport and load out of 40 XXL monopiles up to 100 metres long and more than 1,200 tonnes for Ørsted’s Borkum Riffgrund 3 offshore wind farm. Using a large fleet of SPMTs, we moved both production sections and completed monopiles before they continued towards final installation.
Case

Safe Renovation in a Nature-Protected Area

BMS Kolding assisted in lifting Gelsbro for renovation and returning it safely using Liebherr LTM1250 and LTM1500 cranes, all within the limited space of the nature-protected area.
Case

BMS secures the foundation for Denmark’s energy grid

The Danish electricity grid is facing major changes with more wind, solar and green energy. With over 100,000 steel plates and advanced equipment, BMS ensures an efficient and safe expansion of the grid from the west coast to the east.